You can schedule user reports to run automatically.
Note: Scheduled reports must not use a form to select report criteria; all criteria must be coded into the report itself. For example, the standard report NZMOE_eAR_ATTSTUUNEXD contains selection criteria input through a form. The report NZMOE_eAR_ATTSTUUNEX is the same report with the criteria coded into the report.
You can configure the schedule to:
Opening the Report Scheduling window
Report Scheduling window key fields and buttons
Grid area fields
Grid area field |
Description |
---|---|
Delivery |
Delivery mode of the schedule:
|
Start |
Date the schedule begins. |
End |
Date the schedule ends. |
Frequency |
Whether the schedule repeats on a:
|
Interval |
Number of days, weeks or months (depending on frequency) between scheduled reports. For example, if a report is scheduled to repeat on Monday and Tuesday every four weeks, the Interval would be 4. |
Last Run |
Date the schedule last produced a report. |
Next Run |
Next date the schedule produces a report. |
Fields
Field |
Description |
---|---|
Schedule Type |
Whether the report is scheduled to be run:
|
Delivery Mode |
Whether the report is:
|
Enabled |
Whether the schedule is currently operating. Note: You are only able to edit a schedule if it is enabled. |
Buttons
Button |
Description |
---|---|
Add another schedule for this report. |
|
Delete the selected schedule. |
|
Save changes to the selected schedule. |
Email Settings area fields and buttons
Fields
Field |
Description |
---|---|
Email From |
Staff member to be listed as the sender of the report email. Note: Only staff defined in Staff Maintenance with an occupation email address appear in the drop-down list. |
Email To |
Staff members to send the report email to. |
Email Subject |
Subject line of the email. |
Buttons
Button |
Description |
---|---|
Add a staff member to the list of email recipients. |
One time Occurrence area fields
Field |
Description |
---|---|
Date |
Date and time the report is processed. Note: Press the right arrow key to set the time. |
Frequency area fields
Field |
Description |
|
---|---|---|
Occurs
|
Select the frequency with which the report is run. Note: Different options are presented to configure each frequency. |
|
Occurs |
Description |
|
Daily |
Select the number of days between report runs. |
|
Weekly |
Select:
|
|
Monthly |
Select to run the report either:
For example, you can set the report to run on the second Tuesday of each month, or the last Friday of every three months. |
Daily Frequency area fields
Field |
Description |
---|---|
Occurs once at: |
Schedule the report to run once at a specific time of day. |
Occurs every: |
Schedule the report to run several times during the day. |
Minutes |
Number of minutes between report runs. |
Starting at |
Time of the first report run. |
Ending at |
Time after which no more reports are run. |
Duration area fields
Field |
Description |
---|---|
Start Date |
Date the schedule begins. |
End Date |
Date the schedule ends. |
No End Date |
Either:
|